A Cabanga Africa Publication

Africa Thinks Here

On-the-ground business intelligence in South Africa & Eswatini, since July 2019.

Boundless Southern Africa integration: built-market implications and what comes next

September 10, 2021
Boundless Southern Africa integration: built-market implications and what comes next

The conservation areas at the centre of the Boundless Southern Africa Programme were carved, in most cases, directly across national boundaries that pre-date them by a century, and the roads, border posts, veterinary fences and power lines serving those landscapes were built to a national logic, not a regional one. SADC's environment and tourism ministers agreed in June to advance a programme premised on treating those landscapes as one shared asset; the physical infrastructure underneath them was not built that way.

For a readership focused on infrastructure and built-environment economics, the thesis is that Boundless Southern Africa's commercial viability depends less on marketing than on whether the corridors connecting its conservation areas function as an integrated system: shared border posts, aligned road standards, reliable power and water at remote lodges, and veterinary fencing regimes that do not obstruct the wildlife movement the programme depends on.

June's decision was institutional rather than physical: a feasibility study, a roadmap, and a directive to accelerate winding up the Regional Tourism Organisation of Southern Africa. No infrastructure budget, corridor upgrade or border-post commitment accompanied it.

Border posts built for cargo, not conservation tourism

Many crossings serving SADC's transfrontier conservation areas were designed primarily for freight and general passenger traffic along national corridors, not for tourists moving between game reserves on either side of a boundary. Processing capacity, opening hours and staffing at smaller, park-adjacent crossings often lag far behind the region's main commercial border posts.

A feasibility study for Boundless Southern Africa would need to identify which specific crossings serve the programme's conservation areas and whether their capacity matches an ambition to grow cross-border visitor volumes; the ministers' communiqué on advancing the programme does not itemise crossings, leaving that assessment for the study still to come.

Veterinary fencing versus wildlife corridors

Southern Africa's veterinary cordon fences, erected historically to control livestock disease transmission and protect export markets for beef, in several places cut directly across the wildlife movement corridors transfrontier conservation areas are designed to preserve. Reconciling animal-disease control policy with open wildlife corridors has been a persistent regional tension well before this programme existed.

Nothing in June's decision addresses that reconciliation directly, though it sits underneath any credible feasibility assessment: a tourism product built on free-ranging wildlife cannot fully succeed if veterinary fencing continues to constrain the same migration routes the marketing promises visitors will see.

Power, water and the last-mile lodge economics

Remote conservation-area lodges, the accommodation base any expanded regional tourism product depends on, typically operate off unreliable national grids or entirely off-grid, financing their own diesel, solar or micro-hydro power and their own water infrastructure. Scaling visitor numbers across a shared regional programme raises the capital intensity of that last-mile infrastructure well beyond what any single operator currently carries alone.

No infrastructure financing mechanism accompanied the June decision, and the feasibility study's terms of reference, as far as has been published, do not confirm whether power and water infrastructure for lodges falls inside its scope or is treated as a purely private-sector responsibility [TK]. Development finance institutions active in the region's tourism sector have historically financed individual lodge projects rather than shared corridor-level power or water infrastructure serving several properties at once, a distinction any future Boundless Southern Africa financing model would need to address explicitly.

Roads and the seasonal access problem

Access roads to many transfrontier conservation areas are unpaved and seasonally impassable, a constraint that already limits which months a lodge or circuit can market internationally regardless of any regional branding exercise layered on top. Aligning road standards and maintenance schedules across neighbouring member states sharing a conservation area is a corridor-level infrastructure question distinct from, and harder than, the marketing question ministers addressed in June.

Until national roads authorities commit to coordinated upgrade and maintenance programmes for these specific corridors, a shared regional tourism brand will continue to promise year-round accessibility that the physical infrastructure, in practice, does not yet support in several of the areas concerned. Rainy-season closures on unpaved access roads already shape which lodges can realistically market a year-round product, an operational constraint that predates Boundless Southern Africa and that no regional branding exercise can resolve without matching capital spent on the roads themselves.

Land tenure and concession security

Beneath the visible infrastructure of roads, fences and power lines sits a less visible but equally load-bearing layer: land tenure and concession security. Lodges and tour operators typically hold long-term concessions or leases over land inside or adjacent to transfrontier conservation areas, granted under national law that varies in tenure length, renewal terms and expropriation protection from one member state to the next.

A regional programme that markets a shared destination without addressing whether concession security is comparable across the conservation areas it covers leaves investors exposed to materially different tenure risk depending on which side of a border their project sits, a variable no amount of shared marketing can offset. Nothing published alongside the June decision indicates concession-tenure harmonisation forms part of the feasibility study's scope [TK].

What comes next

The infrastructure test to watch is whether the feasibility study's scope, once published, extends beyond marketing and institutional hosting into a corridor-level infrastructure audit, covering border posts, veterinary fencing, power, water and roads, or whether those questions are left, again, for a separately dated engineering and financing process.

Infrastructure financiers and construction firms active in the region have a planning window to identify which specific crossings, fence lines and access roads a fuller Boundless Southern Africa rollout would need upgraded, positioning ahead of a corridor investment programme that has not yet been announced but that the underlying policy logic makes likely.

Sources

SADC Source: SADC Secretariat

Institutional Source: SADC Secretariat

Independent / Technical Source: UN Tourism (UNWTO)

By The Cabanga Desk

More From This Section